ExplainerInterconnection4 min read

Cluster study: what it is and how it replaced serial processing

A single study covering all interconnection requests that entered the same window, replacing the request-by-request processing that FERC found produced repeated restudies.

A cluster study evaluates every interconnection request that entered a common application window as a single group, against a single base case, rather than evaluating each request individually in queue order. FERC adopted the approach as the default in Order No. 2023, which reformed the pro forma Large Generator Interconnection Procedures.

The change addressed a specific mechanical problem. Under serial processing, each study assumed the projects ahead of it in the queue would be built. When one of them withdrew, the assumptions beneath every study behind it changed and the studies had to be redone. Restudy cascades lengthened timelines across entire regions.

Clustering fixes the base case for the group, so a withdrawal within the cluster is handled through the cluster restudy rules and the cost allocation among remaining members, rather than by restarting the queue behind it. The cluster study produces the identified network upgrades and the allocation of their cost among cluster members. A project that proceeds then moves to the facilities study and, if it continues, to an interconnection agreement.

Questions

How is a cluster defined?
By an application window. Every request that enters during the window and satisfies the entry requirements is studied as one group against a common base case.
Who pays for the study itself?
Study deposits are posted by the participating requesters and, under the pro forma procedures, the cost of a cluster study is allocated among them, commonly on a megawatt basis.

Sources

  1. 01

    Improvements to Generator Interconnection Procedures and Agreements, Order No. 2023

    Federal Energy Regulatory Commission · RM22-14-000 · retrieved 2026-08-09

  2. 02

    Pro forma Large Generator Interconnection Procedures and Large Generator Interconnection Agreement

    Federal Energy Regulatory Commission · pro-forma-LGIP-LGIA · retrieved 2026-08-09

Daily briefing

The dockets, read daily.

One briefing each morning: queue actions, FERC dockets, transmission and large load. Free.

Job title and region are required. They determine which segment of the briefing you receive.