Order No. 2023 sets study delay penalties for transmission providers
The rule states penalty amounts and the study deadlines to which they attach.
Order No. 2023 attached penalties to transmission providers that miss interconnection study deadlines. The intent was to make delay expensive for the party that controls the schedule.
The predictable second-order effect is on study content rather than study timing. A provider facing a deadline penalty has an incentive to complete the study on time with conservative assumptions, producing larger identified upgrade sets, rather than to spend additional time refining assumptions that would reduce them.
Whether that effect is material is an empirical question that will be answered by comparing upgrade cost estimates before and after the penalty regime took effect in each region. The comparison is possible because study reports are available to the customers who commissioned them, though not always publicly.
Order No. 2023-A clarified aspects of the penalty structure on rehearing.
For an interconnection customer, the practical response is to engage on assumptions during the study rather than to dispute results after it.
What to watch: whether any provider seeks waiver or modification of deadline penalties on the basis of study complexity.
Sources
- 01
Order No. 2023-A, order addressing arguments raised on rehearing
FERC · RM22-14-001 · filed 2024-03-21 · retrieved 2026-08-08
More from FERC
- Aug 07, 202603:47 ET
AD24-5-000 record addresses cost allocation for load co-located with generation
Comments in the docket describe rate treatment for large load sited behind or beside an existing generator.
AD24-5-0004 min
- Aug 07, 202602:47 ET
Order No. 1920 requires long-term scenarios in regional transmission planning
The order sets scenario requirements and cost allocation procedures for long-term regional transmission planning.
RM21-17-0004 min
- Jul 26, 202610:47 ET
Order No. 2023 compliance filings set commercial readiness deposit levels
The filings state deposit amounts, site control requirements and the study stages at which each applies.
RM22-14-0003 min
- Jul 26, 202608:47 ET
How GRIDOCKET cites FERC eLibrary documents
Each claim in this publication carries a citation to a filing, order or dataset, with its accession or document identifier.
NATIONAL2 min