Building for the Future Through Electric Regional Transmission Planning and Generator Interconnection
- Agency
- Federal Energy Regulatory Commission
- Filed
- 2024-05-13
- Status
- FINAL RULE
- Items
- 1
Rulemaking that produced Order No. 1920, requiring transmission providers to conduct long-term regional transmission planning on at least a 20-year horizon using multiple scenarios and to adopt cost allocation methods for the resulting facilities.
Open the filing · Order No. 1920