Form EIA-860 records completed generation additions by year

EIA's generator inventory reports operating capacity; interconnection queues report requests. The two datasets measure different stages.

Interconnection queue totals are frequently cited as though they described a pipeline. They describe requests. The Energy Information Administration's Form EIA-860 annual generator inventory and the monthly generator inventory that accompanies it describe units that exist, are under construction, or are planned with reported dates.

Comparing the two datasets over a common period is the standard method for estimating queue attrition. It is imperfect because the populations are not identical, and because a project may appear in both under different identifiers, but it is reproducible from public files.

For a planner, the useful output is not the headline attrition rate but its variation by technology and region. Storage, solar and gas convert at materially different rates, and those differences are stable enough to inform planning assumptions.

For an investor, the same comparison bounds the credibility of any developer's stated pipeline.

This section will maintain the comparison as a standing tracker rather than as a one-off calculation, with each release date recorded.

Sources

  1. 01

    Form EIA-860 detailed data with previous form data

    U.S. Energy Information Administration · EIA-860 · retrieved 2026-08-08

  2. 02

    Preliminary monthly electric generator inventory

    U.S. Energy Information Administration · EIA-860M · retrieved 2026-08-08

More from Data

  1. Aug 02, 202605:47 ET

    Tracker: active interconnection capacity by ISO and RTO

    A standing comparison of study-cycle capacity across the seven organised markets, compiled from operator publications, with a stated date for each figure.

    NATIONAL2 min

Daily briefing

The dockets, read daily.

One briefing each morning: queue actions, FERC dockets, transmission and large load. Free.

Job title and region are required. They determine which segment of the briefing you receive.